Commercial Electrical and Data Design 

World Bank Main Complex, Washington D.C.

Owner
World Bank
Washington, D.C.

General Contractor
The Clark Construction Group, Inc.

Dynalectric’s extensive experience handling large, complicated electrical services projects prepared them for the requirements of the one million-square-foot World Bank Main Complex headquarters building in Washington, D.C.

Working closely with the general contractor and surrounding trades, Dynalectric installed 12 switchboards, three 1,500kw generators, a multiplex fire alarm system, data communication systems, power systems, and a synchronized emergency power system. Their work also included the installation of a complex lighting system which contained over 13,000 lighting fixtures of approximately 120 different types.

Dynalectric earned two Washington Building Congress Craftsmanship Awards for their outstanding work on this data communications project.